Do the preparation task first. Then read the text and tips and do the exercises.
Preparation
Improvements to Oak Hall
Introduction
This report aims to describe problems in Oak Hall of Residence and discuss possible maintenance work to solve them. The two biggest issues were discussed at a meeting on 12 May, which was attended by 165 of the 250 students who live in the building.
Issue 1: temperature in rooms
A number of students complained that the second-floor bedrooms are too hot. Concerns were raised about lack of sleep and students finding it hard to study in their rooms. Air conditioning was suggested as a possible solution.
However, there is no budget left for installing air conditioning this academic year. Also, installation can only be carried out during holidays as students cannot be present in the building while the work takes place.
Issue 2: improving wheelchair access to Oak Café
It was noted that wheelchair users can only access Oak Café from the back and not the front entrance nearer the lifts. This makes access to the café difficult for wheelchair users. The university is looking to improve its wheelchair access in general by installing ramps in key areas and work can take place during term time with no issues for staff or students.
Conclusion and recommendations
Taking the factors mentioned into account, August would be the best time for the installation of air conditioning. Until then, the university could consider supplying fans to each second-floor room so students can sleep and study comfortably.
The front of the café is recommended as an ideal place to install a wheelchair ramp. This work can take place immediately and should be a priority.
Tips
- Start with the aim of the report and say where the information comes from.
- Use subheadings to make the layout clear. Follow a logical structure, e.g.:
- Introduction
- The problem(s) (Give each issue a separate section)
- Conclusion and recommendations
- Assume the person reading the report has asked you to write it and needs only a brief introduction to the situation.
- Use an impersonal, formal style.
- Use the passive to keep the focus off individual people:
Concerns were raised about ...
... was suggested ... - You should also use objective language for recommendations and conclusions:
... would be the best …
the university could consider ...
... is recommended ...
Improve to us department
Introduction
This report aim to describe frequently common issues in our apartment and discuss possible solutions to solve them. Most of the issues have developed due to tenants’ carelessness and irresponsibility. With this report we want to find a solution and consensus for all the member of this apartment.
Issue 1: Cleaning of common areas
All tenants use the community area like kitchen, TV room, living room, bathroom, shower and entrance. So that’s why everyone have to clean this area at least ones a week. For this first issue the proposal is do a schedule to organize the cleaning duties.
Issues 2: Laundry and TV room use
Considering that we are many people in the apartment and a everyone want to use this area, it is important have other schedule to know when is us time to use this area. However if is important to you use this area in a specific day you just need to talk with the person that have this day and have a agreement to change days.
Conclusion and recommendations
Considering a schedule as the best option to organize everyone’s duties, this agreement will start the next Monday but if you have any opinion or suggestion about this proposal, please let us know, we would appreciate your feedback.
Improvements in the ordering process
Introduction
This report aims to describe the main problems in the ordering process at the cafe and discuss possible solutions. The two most significant issues were discussed at the meeting last day, which was participated by members of the order team and managers.
Issue 1: Missing dishes
Customers frequently complain about missing or incorrect dishes being delivered. Concerns were raised about customer dissatisfaction and the return ratio. The possible solution is that the order staff should create and pass bills to the chef. The chef then gives them to the waiter to double-check before taking them to the diner.
However, this solution must be approved by the owner before applying in the cafe and carrying out 1-month trial.
Issue 2: There are no tools for customer feedback
The owner wants to know the customer experience in the cafe; however, there needs to be tools for that. Evaluation form was recommended as a possible solution. The order team and manager are responsible for making it.
Conclusion and recommendations
Taking the factors mentioned into account, two weeks would be the ideal time to apply two solutions. After one month, the team will meet to review the solution's effectiveness.
Maintenance for building B2 in Gize area
This report aims to describe problems in our building B2 and discuss the possible solutions and maintenance work to take place.
The two biggest issues were discussed at the neighbors' meeting in 15 April which was attended by 20 neighbors out of 35 who live in the building
Issue 1: fixed the water leakage from the bathroom in floor 7th
A number of neighbors complained about water leakage from some floors which affected the safety of the building, concerning about the safety arise. replacing the old pipes with the new ones was suggested as a possible solution.
However, there is no budget for replacing the pipes this month and replacement can not take place duo to the working day and the presence of neighbors.
Issue 2 : lift doors arm broking
It was noted the doors of the lift sometimes don't close because of the arm which causes the lift to be hung on on some floors, this creates a lot of problems for the residents of the building and lets them take the stare instead of the lift.
We suggest replacing the old broking arm with a new one during the holidays as many residents will be on vacation.
Recommendation
The maintenance of the lift should take place as soon as possible.
Fixed water leakage needs time and budget and a special contractor so the process should start immediately
Have you ever had to write a report? What for?
when I was a student at the university, I should have written a report on the progress of my thesis every other month. about what I am doing or what steps I have done successfully. also if something didn't live with my hopes, I would explain why the reasons are. Writing these reports was helpful for me because they would make me use my own efficiency in the best way. meanwhile, they would give me an opportunity to bring up my problems with my professor. because my professor wasn't on the hand always.
Improve quality
Introduction
This report aims to describe the most important problems in the university main building. On May 30, two important topics were discussed and attended by all maintenance personnel.
Issue 1: Upgrading computer lab equipment
Concerns were raised because maintenance staff receive many complaints about the performance of the computers in the main building. It was suggested to buy new computers with current technology.
However, the budget will be exceeded if the university purchases new computers, but purchase only specific upgraded parts was recommended.
Number 2: Expand the wellness area
It was suggested to expand the wellness area in order to accommodate a larger number of students. This is necessary because students are disgusting because they don't have enough space to play and relax. The staff is looking to expand all areas, but actually the university can improve the wellness area.
Conclusion and Recommendations
Taking the factors mentioned into account, better computer parts for labs should be purchased. Expanding the wellness area is the priority, requesting the necessary permission to work outside should be done soon, for now maintenance recommends working inside with small infrastructure changes.
Lack of teaching staff in the department
Introduction:
This report aims to describe a lack of teaching staff in the department and suggested solutions. This issue was discussed at a meeting on 12 June, which was attended by all of the students.
Issue:
The students wanted to study up-to-date courses and update the materials of the ongoing courses but the issue is there is no staffing to teach or update the courses.
Conclusion and recommendations:
The student suggested hiring new teachers or providing paid online courses from famous online course websites for free.
Improvements to Cool Learning Center
Introduction
This report aims to describe problems in Cool Learning Center and discuss possible solution. The two biggest issues were disscused at a meeting on 2nd of April, which was attended by the office staff and manager who work for Cool Learning Center.
Issue 1: insufficent space
Even though the classrooms were intended for 10 students of class size, the number of students is increasing up to 15 at the moment so that the students cannot do the lessons very well due to the insufficent space. Consequently, the ventilation inside the room is not good.
Issue 2: improving bike rack
It was noted that some students who come to class by bicycles parked their bikes in the sun where is not secured and the heat can disturb the bikes as well.
Conclusion and recomendations
Classroom expansion should be taken into account the fact that large rooms are currently needed. Construction can be started at the beginning of Thingyan holiday.
The bike rack is recommended to do immediately since it is outside the class building and it should be a priority.
This report aims to describe problems in technical school and discuss possible solution to solve them.
Issue 1: exams of end academic year will start soon and will be held in the main hall as regard the main hall has no sufficient air conditioning so the students will encounter to problems during their exams.in other hand there is no enough budget left for buying advanced and most powerful new airconditioning .
Coclusion and recommendation: taking the factors mentioned in account it is recommended that shall school principal make a session with his assistants to survey of best way to supply enough budget for buying air conditioning for main hall
Improvements to Dental hospital.
Introduction:
This report aims to describe problems in Vaco dental hospital and discuss problems to solve them.
Issue 1:
workers in hospital need overtime to work but unfortunately it was recognized that no one stays and works in overtime because all workers and doctors finished their work in the morning, hospital paid a huge amount of money monthly without any benefit for workers how stay for overtime.
Issue 2:
There’s a massive problem in the appointment system which is there are a lot of patients who take an appointment without coming, so a lot of appointments aren’t used.
Conclusion and recommendations:
For the first issue installing a machine for checking out who come and when they come it would be a great idea for the hospital.
The recommendation for the second issue is banning people who take an appointment without using it that will make people more responsible about it.
Maintenance work in Plaza Hotel
Introduction
This report aims to describe the current situation in Hotel's kitchen and discuss possible maintenance work to solve them.
Issue 1: extractor hood
The personnel working there is complained about the main hood. Concerns were raised some months ago about the age of the hood that is no longer fully functional. A new one is suggested as a possible solution.
Issue 2: freight elevator
It was noted that the freight elevator, used to load/unload from/to the pantry of the hotel, sometimes crashes. Concerns are raised concerning the delay during the loading operations and, as consequence, the extension of working hours.
Conclusion and recommendations
Taking the factors mentioned into account, next week the Hotel board of directors is going to make a meeting for dealing with these topics. It'll be suggested to use the budget to buy and install a new hood, while, regarding the second issue, one solution that will be proposed is to use the smaller freight elevator placed in the left wing.